Preliminary Framing Budget Assessment.

Early-stage budgeting guidance based on completed Maccabi Framing projects — no drawings or takeoffs required.” supporting paragraph: “This tool is designed to help builders and general contractors understand where a project is likely to land before investing time in full pricing.

Smart Estimate Framing Budget Assessment.

Answer a few high-level questions below to generate a preliminary framing budget range. 

  • Step 1: Core Info
  • Step 2: Optional Details
  • Step 3: Contact + View

Core Project Information

Approximate values are fine — this step is not intended to be exact.

For best results use Gross Floor Area.
Use 4 for 4+ storeys.
As shown on roof plan. If unknown approximation is sufficient.

Optional Project Details

If unsure leave blank - the assessment will still generate a range.

Count individual beams

Combined linear footage across all beams

Posts requiring layout plumbing, or temporary support.

From subfloor to top plate.

View Your Preliminary Assessment

Enter your details to view your preliminary framing cost assessment.

Where should we send your estimate?

Frequently Asked Questions

No.
This assessment is intended for early-stage budgeting only and does not represent a formal quote.

Final pricing is always confirmed from permit drawings after reviewing structure, access, sequencing, and site conditions.

The range is designed to provide planning-level guidance based on historical pricing from completed Maccabi Framing projects.

It’s meant to help determine feasibility — not replace a full takeoff or detailed estimate.

No.
This assessment is not suitable for permits, contracts, or lender documentation.

A formal framing proposal is prepared only after permit drawings are available.

At early design stages, project scale, structure, and complexity account for most budget movement.

This tool uses those high-level inputs to provide orientation — not precision.

No.
The assessment does not commit either party to pricing or scheduling.

It’s simply a planning reference to help guide next steps.

No.
The assessment reflects how Maccabi Framing prices its own work based on completed projects.

Other contractors may approach pricing differently.

Once permit drawings are available, we can review the set and prepare a detailed framing proposal based on confirmed scope and conditions.

Why Builders Choose Maccabi Framing.

Fast Turnaround

Estimates delivered within 3 business days.

Transparent Pricing

No hidden fees or scope gaps.

Proven Process

Backed by years of reliable, code-compliant framing.

Let’s Frame Your Next Project.

Talk to our team about your next project or request an estimate in minutes.

Create an account to access this functionality.
Discover the advantages